
COMPLETE TRANSFORMATION
Full renovation in Molenbeek-Saint-Jean
A 19th-century rental house or a 1930s flat in Molenbeek often comes with outdated wiring, old pipes and little or no insulation. A full renovation deals with everything in the right order, with one itemised quote.
Price per square metre
In Belgium, a turnkey renovation usually costs €1,200 to €3,000 per m² excluding VAT: €1,200 to €1,500 in the standard range, €1,600 to €2,100 in the comfort range, €2,200 to €3,000 and more at the high end. For a 70 m² flat in the standard range, that is €84,000 to €105,000 excluding VAT. VAT is 6% for a home over 10 years old.
House split into flats: one home or several?
Many rental houses in the centre are divided into several homes. Changing that number (merging two flats or creating a new one) needs a planning permit in Brussels, even if the facade is untouched. An architect then prepares the application while we price the works.
A work sequence for narrow houses
In a narrow terraced house everything goes up the same staircase: demolition and removal, structure and roof, wiring and plumbing, plastering, screeds and tiling, joinery, painting, then the kitchen and bathroom. As the street is often narrow, we group deliveries and rubble removal to keep skip days down, since they need a permit and a municipal tax. Allow 3 to 6 months on site for 100 m².
EPB: reaching class E before 2033
Every Brussels home must reach at least class E (275 kWh/m²/year) by 1 January 2033 at the latest. A full renovation is the time to insulate the roof, replace the windows and rethink the heating, rather than reopening finished rooms later. The RENOLUTION grants are suspended; zero-interest loans are announced for spring 2027.
Our completed projects
A few renovation projects presented by CULA.
Frequently asked questions
What should I check before buying a house to renovate in Molenbeek?
The EPB certificate, the electrical inspection report (required on sale), the number of dwellings allowed by planning and whether the building is on the heritage inventory. We can visit with you and estimate the works.
Can I live in the home during the works?
Rarely during a full renovation: power, water and floors are off or opened up at the same time. On a phased project, we work floor by floor.
How long should I allow for permits?
For the road, several weeks (30 working days in the 2024 tax regulation). If a planning permit is needed it takes longer, and work only starts once the permit is displayed and the municipality has been notified, 8 days before the start.
CLIENT REVIEWS
Our reviews are on Google
We don't copy reviews onto this site: read them where our clients posted them, with their name and date.
Our other services — Molenbeek-Saint-Jean
Your full renovation in Molenbeek-Saint-Jean
Free site visit, itemised quote, no obligation.


