
COMPLETE TRANSFORMATION
Complete renovation in Etterbeek
A pre-1940 Brussels house in Etterbeek often has a facade to keep and an interior to redo completely: wiring, heating, pipes, floors, kitchen and bathroom. For a rented flat, the complete renovation is fitted between two lets. Here are the points specific to Etterbeek.
Budget for a complete renovation in Etterbeek
Figures from our calculator, including 6% VAT for a home over 10 years old, site in average condition, architect's fees excluded:
- —70 m² flat (standard range): €89,000 to €111,500
- —100 m² flat (standard range): €127,000 to €159,000
- —140 m² Brussels house (standard range): €178,000 to €222,500
- —Architect's fees, if one is needed, are usually 7 to 12% of the works
The Brussels house, floor by floor
82% of Etterbeek's buildings date from before 1945. In these narrow, deep houses a complete renovation often follows the same thread: roof and cornice, timber floors to check, new wiring and pipes in a single stairwell, central heating to review, then insulation of the back wall and the annex on the courtyard side, where it does not change the street view.
Splitting, merging or letting
Many Etterbeek houses are now split into flats. Creating or removing a home changes their number and needs a planning permit, so an architect. For a let property, a complete renovation is also the time to reach the EPB class E required by 2033 and to bring the wiring up to standard, inspected by an approved body.
Schedule and access
Expect 3 to 6 months for 100 m² and 4 to 8 months for a 150 to 200 m² house, not counting any permit. Meanwhile the skip and scaffolding occupy the street: in Etterbeek they are requested on the Eaglebe platform, with an Osiris permit as well on a regional road. A dated schedule is handed over before we start.
Our completed projects
A few renovation projects presented by CULA.
Frequently asked questions
Where do I start in a pre-war Brussels house?
With the envelope and what you cannot see: roof, damp, wiring, pipes and heating. Finishes come afterwards. Reversing the order means undoing what has just been done.
How much does a complete renovation of a 70 m² flat cost?
In the standard range, €89,000 to €111,500 including 6% VAT according to our calculator, for a site in average condition. The exact price follows the visit.
Is a permit needed for a complete renovation?
Not for indoor work that leaves the structure, the facade and the number of homes unchanged. A load-bearing wall, an extension or splitting into flats need a permit and an architect.
CLIENT REVIEWS
Our reviews are on Google
We don't copy reviews onto this site: read them where our clients posted them, with their name and date.
Our other services — Etterbeek
Your complete renovation in Etterbeek
Free site visit, itemised quote, no obligation.


