
COMPLETE TRANSFORMATION
Full renovation in Uccle
In Uccle, a full renovation usually concerns a house or villa built between the interwar years and 1980, on a plot with a garden. Areas are large and facades numerous: the budget and the energy gain depend on the envelope as much as on the interior.
Budget for an Uccle villa or house
2026 benchmarks excluding VAT, labour and materials included: €1,200 to €1,500 per m² for standard, €1,600 to €2,100 for comfort, €2,200 to €3,000 and more for high end. With 6% VAT and average condition, our calculation gives for example:
- —150 m² house, comfort range: €254,500 – €334,000
- —200 m² villa, high end: €466,500 – €636,000
The envelope of a detached house
A detached villa loses heat through four facades, the roof and the floor. In a full renovation, the roof and windows come first, then the walls, before sizing new heating: a system calculated for the insulated house is smaller and cheaper. Since 1 June 2025, an oil boiler can no longer be installed in Brussels, even as a replacement.
Garden, trees and extension
A full renovation often comes with an extension towards the garden: it needs a planning permit and an architect. Felling a tall tree for site access or for the extension also needs a permit. We organise machine access and storage on the plot to limit road occupation.
Roads and authorisations in Uccle
For works lasting months, Uccle handles occupation of the public road (skip, scaffolding, hoist) and parking reservation separately; each request must arrive at least 5 working days ahead, before noon. On Chaussée de Waterloo, Avenue Brugmann or another regional road, the Region's Osiris authorisation is a prerequisite.
Our completed projects
A few renovation projects presented by CULA.
Frequently asked questions
How long does a full renovation in Uccle take?
Usually 4 to 8 months for a 150 to 200 m² house, excluding design and permits. An extension or changes to load-bearing walls bring it closer to 8 months.
Can you live in the villa during the works?
For a full renovation, rarely: electricity, heating and water are cut at times. A phased renovation, floor by floor, is the alternative.
Which EPC class should an Uccle villa aim for?
At least class E for 2033, which means 275 kWh/m²/year. A full renovation usually allows you to go further; the next regional target is 150 kWh/m²/year, at the earliest at the end of 2045.
CLIENT REVIEWS
Our reviews are on Google
We don't copy reviews onto this site: read them where our clients posted them, with their name and date.
Our other services — Uccle
Your full renovation project in Uccle
Free site visit, itemised quote, no obligation.


