Skip to content
    Full renovation in Woluwe-Saint-Lambert

    COMPLETE TRANSFORMATION

    Full renovation in Woluwe-Saint-Lambert

    Woluwe-Saint-Lambert is a post-war municipality: three homes in four date from after 1945. A full renovation there usually concerns a flat in a large block, sometimes a 1920s or 1930s house in the Georges-Henri district or a villa on the Linthout plateau.

    Flat: renovating within the co-ownership's limits

    Everything inside can be redone: partitions, floors, wiring, plumbing up to the stacks, kitchen and bathroom. Facade, windows, roof and shared heating remain general meeting decisions. For the EPC, the flat's share therefore comes mainly from ventilation, lighting and, when the co-owners agree, the windows.

    Budget per m²

    2026 benchmarks excluding VAT, labour and materials included: €1,200 to €1,500 per m² for standard, €1,600 to €2,100 for comfort, €2,200 to €3,000 and more for high end. With 6% VAT and average condition, our calculation gives for example:

    • —85 m² flat, standard range: €108,000 – €135,000
    • —110 m² flat, comfort range: €186,500 – €245,000
    • —140 m² house, standard range: €178,000 – €222,500

    House or villa: envelope first

    In an interwar house or a Linthout villa, the full renovation also covers the roof, windows and insulation, before the heating is replaced. An oil boiler can no longer be installed since 1 June 2025. An extension or a change to the facade needs a planning permit and an architect.

    Logistics in a large block

    Works lasting several months in an occupied building are prepared with the building manager: lift protection, hours, access for workers. On the street, each skip or hoist is requested from the public domain occupation unit at least 10 working days ahead, after an Osiris authorisation if it obstructs traffic.

    Our completed projects

    A few renovation projects presented by CULA.

    Frequently asked questions

    How long does a full flat renovation take?

    Usually 3 to 6 months for 100 m², excluding design. In an occupied building, the hours in the building rules can stretch the schedule a little.

    Is a permit needed to fully renovate a flat?

    Not as long as the structure, facade and number of dwellings stay the same. Merging two flats or dividing one needs a planning permit.

    What margin should I keep?

    Keep 10 to 15% of the budget for surprises. In a post-war building, they mostly come from the original wiring and the screeds.

    CLIENT REVIEWS

    Our reviews are on Google

    We don't copy reviews onto this site: read them where our clients posted them, with their name and date.

    Your full renovation project in Woluwe-Saint-Lambert

    Free site visit, itemised quote, no obligation.