Skip to content
    Complete renovation in Anderlecht

    COMPLETE TRANSFORMATION

    Complete renovation in Anderlecht

    A terraced house in Anderlecht from the 1920s to the 1960s often needs everything redone at once: roof, wiring, plumbing, heating, then kitchen, bathroom and finishes. The municipality borders Dilbeek, where CULA is based. Here are the points specific to Anderlecht.

    Budget for a complete renovation in Anderlecht

    Figures from our calculator, including 6% VAT for a home over 10 years old, site in average condition, architect's fees excluded:

    • —70 m² flat (standard range): €89,000 to €111,500
    • —120 m² house (standard range): €152,500 to €191,000
    • —150 m² house (standard range): €191,000 to €238,500
    • —Keep a 10 to 15% margin for the surprises of an old building

    Three kinds of house, three kinds of job

    In Cureghem, 19th-century houses often split into flats need work on damp, floors and shared parts. In the centre, 1950s and 1960s bel-étage houses suit a heavy renovation well: sound structure, but wiring, heating and insulation to redo. In the La Roue, Bon-Air and Moortebeek garden cities, facades and surroundings follow specific rules of the municipal regulation: the outside appearance is discussed before the design.

    Splitting, merging or changing use

    Changing the number of homes or turning a workshop into a home needs a planning permit, and so an architect. In Anderlecht the municipal regulation adds conditions for splitting: a mix of home sizes, no overcrowding, keeping the building's qualities. It also sets living standards (floor area, height, light, ventilation) that works on an existing home must improve.

    Order of works and EPB

    Demolition, structure, roof and insulation, wiring and plumbing, plastering, screed and tiling, joinery, painting, then kitchen and bathroom. Expect 3 to 6 months for 100 m² and 4 to 8 months for a 150 to 200 m² house, not counting the permit. A complete renovation is the right time to reach the EPB class E that Brussels requires by 2033 and to replace an oil boiler, which can no longer be installed since June 2025.

    Our completed projects

    A few renovation projects presented by CULA.

    Frequently asked questions

    Can I live in the house during the works?

    Rarely during a complete renovation: power, water and heating are cut at times. A phased renovation, floor by floor, is possible if the budget is spread over several years.

    Do I need an architect to renovate a house in Anderlecht?

    Yes as soon as a permit is needed: load-bearing wall, extension, splitting into flats, change of use. The fees are usually 7 to 12% of the works. For indoor work without structural changes it is not required.

    How much does a complete renovation of a 120 m² house cost?

    In the standard range, €152,500 to €191,000 including 6% VAT according to our calculator. The exact price depends on the condition of the house, which we see during the free visit.

    CLIENT REVIEWS

    Our reviews are on Google

    We don't copy reviews onto this site: read them where our clients posted them, with their name and date.

    Your complete renovation in Anderlecht

    Free site visit, itemised quote, no obligation.