
COMPLETE TRANSFORMATION
Full renovation in Koekelberg
Fully renovating a house in Koekelberg often means upgrading a late 19th-century or 1920s-30s building without erasing its character. CULA coordinates every trade, with a single point of contact and a detailed itemised quote.
Budget per square metre
A turnkey renovation usually costs €1,200 to €1,500 per m² excluding VAT in the standard range, €1,600 to €2,100 in the comfort range and €2,200 to €3,000 and more at the high end; the common average is €1,500 to €2,500. For a 150 m² house in the comfort range, expect €240,000 to €315,000 excluding VAT. VAT is 6% for a home over 10 years old.
Keeping the facade, redoing the inside
On Boulevard Léopold II, the eclectic houses form uniform street fronts; on the plateau, the Art Deco facades have their own details. A full renovation can redo everything inside while restoring the facade: changing its look (windows, materials, openings) generally needs a permit, and a protected building needs a single permit with the opinion of the Royal Commission for Monuments and Sites.
Timing and order of works
Allow 3 to 6 months for 100 m² and 4 to 8 months for a 150 to 200 m² house, excluding design and permits. The order stays the same: demolition, structure, roof and insulation, wiring and plumbing, plastering (at least 4 weeks of drying), screeds and tiling, joinery, painting, kitchen and bathroom.
Insulating an old house without damaging it
To reach at least class E before 1 January 2033, the roof usually comes first; on the street facade, insulation is rather done from inside to preserve the decoration. Suitable ventilation prevents condensation in old walls. The RENOLUTION grants are suspended; the Region has announced zero-interest loans for 2027.
Our completed projects
A few renovation projects presented by CULA.
Frequently asked questions
Do I need an architect to renovate a house in Koekelberg?
For works that need a permit (structure, volume, facade, number of dwellings), an architect is generally required. For interior renovation without a permit, no; we also work with your architect.
Can I stay in the house during the works?
During a full renovation we advise against it: water and power are cut at times and dust gets everywhere. In a phased renovation, we free up one part of the house at a time.
Where do I start if the budget does not cover everything?
With the envelope (roof, windows) and the services (wiring, plumbing), then the finishes. Doing it the other way round means reopening finished rooms.
CLIENT REVIEWS
Our reviews are on Google
We don't copy reviews onto this site: read them where our clients posted them, with their name and date.
Our other services — Koekelberg
Your full renovation in Koekelberg
Free site visit, itemised quote, no obligation.


