Skip to content
    Bathroom renovation in Molenbeek-Saint-Jean

    BATHROOM

    Bathroom renovation in Molenbeek-Saint-Jean

    Molenbeek's 19th-century workers' cottages had no bathroom: sometimes a single latrine served a whole alley. Today's bathrooms were added later, often in very little space, or sit in interwar flats connected to shared risers.

    Small space, realistic prices

    Home over 10 years old, 6% VAT included, site in average condition:

    • —Complete 4 m² bathroom (standard range): €10,000 – €13,500
    • —Complete 5 m² bathroom (standard range): €12,000 – €16,000
    • —Bath replaced by a walk-in shower: €4,500 – €7,000
    • —Fixtures replaced without touching the walls: €4,000 – €8,000

    Gaining space in 4 m²

    A wall-hung toilet, a shallow vanity unit and a shower instead of the bath free up more room than you would think. Keeping the toilet and shower where they are saves money: moving a drain usually adds €500 to €1,500 of labour. On a timber floor, a level-access shower needs the available depth checked; otherwise an ultra-flat tray does the job.

    Shared risers and the neighbours below

    In a house split into flats or an apartment building, the bathroom connects to a shared riser. Before the walls are closed, we pressure-test the new pipes and lay a waterproof membrane under the tiles across the whole shower area: that is what protects the flat below. Work on the riser itself needs the agreement of the owner or the co-owners.

    Ventilation and wiring in a small room

    A bathroom with no window, or only a small skylight, needs mechanical extraction; without it, mould comes back. The Belgian wiring code (RGIE/AREI) sets safety zones around the shower for sockets and lights: in 4 m², they decide where the mirror and switches go. Allow 12 to 18 working days on site once the materials are chosen.

    Our completed projects

    A few renovation projects presented by CULA.

    Frequently asked questions

    Can a bathroom be added upstairs in a workers' cottage?

    Yes, if water and a drain with enough fall can be brought to the existing waste pipe, and the floor can take the weight of the shower and tiles. We check this during the visit.

    Do I need a permit in Molenbeek to redo a bathroom?

    Generally not if the work stays inside. Making a new window in the facade, changing the structure or working in a listed building does need a permit.

    What if it is the only bathroom in the home?

    We plan the job to keep the disruption short: fixtures and tiles are ordered before demolition, and we arrange a temporary shower with you during the works.

    CLIENT REVIEWS

    Our reviews are on Google

    We don't copy reviews onto this site: read them where our clients posted them, with their name and date.

    Your bathroom in Molenbeek-Saint-Jean

    Free site visit, itemised quote, no obligation.