
BATHROOM
Bathroom renovation in Saint-Gilles
In Saint-Gilles townhouses and blocks of flats, mostly built before 1919, the bathroom is almost always an addition: a former bedroom, an enclosed landing, a corner of the kitchen. Renovating it starts with checking what lies under the floor and where the water runs.
Timber floors and waterproofing
In Saint-Gilles buildings, upper floors usually rest on timber joists. A walk-in shower there needs continuous waterproofing and a drain that does not notch the joists; an ultra-flat tray or a slight platform is often safer than a recessed wet-room shower. We open the floor at the start of the works to judge the state of the joists.
Stacks and neighbours
In a house divided into flats, the waste runs to a shared stack, often an old one. If it must be replaced or cut into, that is a co-ownership decision. Noisy work and demolition follow the hours set in the building's rules.
Bathroom budgets in Saint-Gilles
Amounts including 6% VAT for a home over 10 years old:
- —5 m² bathroom, standard range: €12,000 – €16,000
- —5 m² bathroom, premium range, average condition: €18,000 – €23,500
- —Bath replaced by a shower: €4,500 – €7,000
- —Moving the toilet or the drain: €500 – €1,500 extra labour
Permits and the street in Saint-Gilles
Replacing fixtures, tiles and pipes needs no permit. Creating a bathroom that changes the layout of the dwellings, or touching a protected feature of a listed building, does. For the demolition skip, the request goes through Osiris at least 10 working days before delivery, and the occupation tax is €2 per m² per day, minimum €120.
Our completed projects
A few renovation projects presented by CULA.
Frequently asked questions
Can you build a wet-room shower on a timber floor in Saint-Gilles?
It is possible if the depth under the floor allows a sloped drain without notching the joists, with full waterproofing. Otherwise an ultra-flat tray gives a similar look with less risk.
Do I need the co-owners' approval to redo my bathroom?
Not for the inside of your flat. Yes if the works touch a stack, a shared duct or the facade.
How long do the works take?
Usually 12 to 18 working days once the materials are chosen. In an old building we keep a margin for what demolition reveals.
CLIENT REVIEWS
Our reviews are on Google
We don't copy reviews onto this site: read them where our clients posted them, with their name and date.
Our other services — Saint-Gilles
Your bathroom project in Saint-Gilles
Free site visit, itemised quote, no obligation.


