
BATHROOM
Bathroom renovation in Woluwe-Saint-Pierre
In Woluwe-Saint-Pierre houses built after 1945, the original bathroom is usually on the bedroom floor, with pipes and wiring that may be more than fifty years old. As houses are larger than the Brussels average, the renovation is also a chance to enlarge the room or create a second one.
Replace what you cannot see
A house in Chant d'Oiseau, Val d'Or or Putdael built in the 1950s or 1960s sometimes still has its original pipes. Once the tiles are off, we replace them back to the meter or the stack, redo the room's electrical circuits and install mechanical extraction. That is what prevents leaks and mould ten years from now.
En-suite in a villa
In a villa, a bedroom or adjoining dressing room can become a bathroom: walk-in shower, double basin, separate toilet. As long as the structure does not change and no window is added to the facade, no permit is needed. On the Stockel plateau, a new window or dormer must also follow the zoned regulation.
Bathroom budgets in Woluwe-Saint-Pierre
Amounts including 6% VAT for a home over 10 years old:
- —6 m² bathroom, standard range, average condition: €13,500 – €19,000
- —8 m² bathroom, standard range: €17,500 – €24,000
- —9 m² en-suite, premium range, average condition: €30,000 – €40,000
- —Plumbing and supply lines, for 7 to 8 m²: €2,500 – €4,500
Skip and parking
For demolition, the parking reservation is requested by email from the public space and mobility department at least 5 working days ahead, 10 in July and August; it costs a €48 flat fee plus €10.50 per sign per day. The skip is declared in Osiris and to the municipality.
Our completed projects
A few renovation projects presented by CULA.
Frequently asked questions
How much does an en-suite cost in Woluwe-Saint-Pierre?
For 9 m² in the premium range, our calculation gives €30,000 to €40,000 including 6% VAT, for average condition. In the standard range, an 8 m² bathroom usually costs €17,500 to €24,000.
Should the pipes of a 1960s house be replaced?
It is almost always advisable when the walls are open: replacement then costs far less than after the new tiles are laid.
How long do the works take?
Usually 12 to 18 working days once the materials are chosen. If the house has a second shower room, it stays habitable during the works.
CLIENT REVIEWS
Our reviews are on Google
We don't copy reviews onto this site: read them where our clients posted them, with their name and date.
Our other services — Woluwe-Saint-Pierre
Your bathroom project in Woluwe-Saint-Pierre
Free site visit, itemised quote, no obligation.


