Kitchen renovation prices in Brussels in 2026

In short: how much does a kitchen renovation cost in Belgium in 2026? €3,000 to €8,000 for a refresh, €8,000 to €18,000 for a like-for-like replacement and €15,000 to €35,000 for a complete renovation, fitting and 6% VAT included for a home older than 10 years. Estimate yours with our price calculator.

"How much does a new kitchen cost?" The answer ranges from a few thousand euros to over €50,000, and that's not dodging the question: it all depends on what you actually change. Here are realistic ranges for Brussels and its outskirts, and what moves them.

Budgets by type of project

Indicative amounts, fitting included, 6% VAT included for a home over 10 years old:

Project What changes Indicative budget
Refresh Doors, worktop, splashback, paint €3,000 – €8,000
Like-for-like replacement New units and appliances in the same layout €8,000 – €18,000
Full renovation New layout, plumbing, electrics, floor €15,000 – €35,000
High-end bespoke Bespoke joinery, stone, premium appliances from €30,000

Units and appliances can be half the budget: the same job can cost twice as much depending on the range you choose.

What drives the price

Moving or keeping the layout

Keeping the sink and hob where they are is the biggest saving possible. Moving the sink to an island means creating a drain with enough fall, sometimes in an existing screed, and often new water supplies.

Electrics

A modern kitchen needs several dedicated circuits (oven, hob, dishwasher, fridge). In many older Brussels homes the fuse board has to be adapted, and the installation inspected by an approved body.

The cooker hood

In Brussels, many apartments don't allow an outside vent. A recirculating hood works, but an outside vent (where possible and permitted) is more effective. Decide this before designing the kitchen.

The worktop

From laminate to quartz or ceramic, the price gap for the same worktop can exceed €3,000. Mineral materials need templating after the units are fitted, which adds one to two weeks.

Co-ownership

In an apartment, working on the drain stacks requires the building manager's (syndic) approval, and working hours are often restricted.

How long does it take?

Paying less without regrets

  1. Have the contractor invoice the work: VAT drops from 21% to 6% on fitting and the materials they supply, if the home is over 10 years old.
  2. Keep the supplies and drains where they are, if the layout allows.
  3. Invest in hinges, runners and the worktop (what wears) rather than very expensive doors.
  4. Group it with other works (floor, living-room electrics): one coordination, fewer lost days.

Frequently asked questions

Do I need a permit to renovate a kitchen? Usually not, as long as you don't touch the structure, the façade or the layout of the dwellings. Opening a load-bearing wall for an open kitchen, however, requires a structural study and often a permit.

Can I keep my old appliances? Yes if their dimensions fit the new units. Check before ordering.

Does the calculator on the site give the final price? No, it gives an order of magnitude. The final price comes from an on-site visit and a detailed quote.